Material Only Operations

Material Only Operations

Material only operations are created to add non-time related materials to a job. For instance, you might want to add H-Stakes to a Wide Format sign. There is no time involved (ie. you are not inserting a banner into a banner stand), you are just adding the stake to an order. 

The most efficient way to do this is to create a Manufactured Material Inventory Item.

Creating the Manufactured Material

Manufactured materials can be bulk uploaded or created directly in the inventory item by clicking the create new item button:


When you create a Manufactured Material, the CODE becomes the inventory item code, and you choose what location the inventory resides in:

Controls for the Manufactured Material

You can choose which operation category it will appear under (ie, quoting category), and when you create a Manufactured Material, it will create a material-only operation automatically:

Like a Raw material, you can choose the calculation method to be used when calculating how much of this material will be brought in to the quote:

Operation Settings and Controls

There are several operation settings and controls that are created when you create a Manufactured Material.

IdentifierField/BoxUse Description
(a)NameThe Code (Generated from the Inventory Code)
(b)DescriptionThe name you want the item to appear under in estimating
(c)NotesAny specific notes you want under this item (i.e.. what it is for, how to use)
(d)Customer Desc GroupThe customer description group you want to use
(e)Customer DescriptionHow you want this item to appear to the customer on the quote letter
(f)Job bag orderThe order you want this item to appear on the job bag
(g)Operation TypeEither a Job or a Section Operation
(h)
The category you want the estimator to see this item under
(i)
The schedule category you want this item to appear under on the production boards
(j)
Which department does this belong to 
(k)
The Revenue GL or Nominal code you want assigned to this item
(l)
The Expense GL or Nominal code you want assigned to this item
(m)
The reporting code you want assigned (to pick upon on reports)
(n)Hide from the FilterHide this item from the filters 
(o)
Turn off the guillotine when using this item
(p)For Automation integration
(q)This item is bought from a supplier and will prompt an "outsource" action on the quote
(r)Show this item on the job bag for production
(s)Show this item on the quote letter
(t)Hide this item from production planning 
(u)Activate or Deactivate this item
(v)To be determined
(w)This item will be invoiced as per the quote unless it is a timed item
(x)Add a parameter so you can choose how many (automatically turned on)
(y)Integrate with production automation (i.e. switch)
(z)Prompt the user to enter the actual and invoice using this number rather than the quoted number
(aa)
Will show up on the capacity planner

Alert
These items can also be added to component records of operations, but technically, those items should be RAW MATERIALS. 

    • Related Articles

    • Materials Admin/Raw Materials

      A raw material can be created and added to a 'Material Set'. Material Sets' are then linked to pricing component lines within operations, so they are included in quoting for cost and inventory purposes. This is managed from ‘Material Admin’ under ...
    • PLATES - Create material and link to press - NEW 2018 OPTION

        Plates need to be created as 'Raw Materials' then linked to a 'Section' operation. Then they can be linked to the required press. To create the plate go to Admin>Configure Factory>Raw Material     From here, under 'Equipment' select 'Raw Material ...
    • Material and Labour Sets

        The following procedure outlines how to setup a new material or Labour set in PrintIQ. All this is managed from Admin>Configure Factory scroll to the bottom to find the Advanced Materials section. Open Advanced Material and Labour Sets.     Go to ...
    • Inline Coating Operation Setup and Material Area Multiplier

      Purpose This article explains how to set up an inline coating operation in printIQ, how coating usage is calculated, and how to apply the correct material area multiplier for accurate costing. An inline coating operation can be set up as a standalone ...
    • Operation Component Definitions for Job-Finishing

      Differences Between SIDE, SECTION and JOB Operations IQ has an extremely powerful engine that drives each operation. The component records for SIDE, SECTION and JOB operations all have different functionality, and you need to decide what you want to ...