Material and Labour Sets

Material and Labour Sets

 


The following procedure outlines how to setup a new material or Labour set in PrintIQ.
All this is managed from Admin>Configure Factory scroll to the bottom to find the Advanced Materials section.
Open Advanced Material and Labour Sets.


 


 

Go to the Current Material Sets header and select ‘Add New Material Set’. 

 

 

 


This popup allows you to enter the material set information.

 


 

Enter a ‘Code’ and a Description. Click Add Material Set.



 

 

Once you have added the material set it will show in a list at the bottom of the screen.

 



You use this set to link a material cost that you can make under ‘Materials and Labour’.




 



    • Related Articles

    • PLATES - Create material and link to press - NEW 2018 OPTION

        Plates need to be created as 'Raw Materials' then linked to a 'Section' operation. Then they can be linked to the required press. To create the plate go to Admin>Configure Factory>Raw Material     From here, under 'Equipment' select 'Raw Material ...
    • Inline Coating Operation Setup and Material Area Multiplier

      Purpose This article explains how to set up an inline coating operation in printIQ, how coating usage is calculated, and how to apply the correct material area multiplier for accurate costing. An inline coating operation can be set up as a standalone ...
    • Materials Admin/Raw Materials

      A raw material can be created and added to a 'Material Set'. Material Sets' are then linked to pricing component lines within operations, so they are included in quoting for cost and inventory purposes. This is managed from ‘Material Admin’ under ...
    • Material Only Operations

      Material only operations are created to add non-time related materials to a job. For instance, you might want to add H-Stakes to a Wide Format sign. There is no time involved (ie. you are not inserting a banner into a banner stand), you are just ...
    • Packing Operation with Carton Calculations

      You can now expand the functionality of your packing operations to calculate the packing time as well as the required quantity of the most suitably defined Cartons needed for the job. There are two parts to setting this up  Material (the carton ...