On the Production Board there are columns called TOT (Total Operation Time),TST (Total Section Time) and TPT (Total Production Time).
On the Pre-Production Board two of these exist; TOT (Total Operation Time) and TPT (Total Production Time).
Also, on the Operations Board a column called Hrs (Hours) exists.

Above the header row for all of the columns mentioned, the total time is displayed for the visible jobs/sections.

TOT

Total Operation TimeThe system will calculate the total amount of Operation time based on the amount of jobs that show on the board:


TST

Total Section Time - This column only displays on the Production Board and it shows the total time to produce sections displayed on the board:


TPT

Total Production TimeThe system will calculate the total amount of production time based on the amount of jobs that show on the board:


Hrs

Hours (HH:mm) - On the Operations Board the column Hrs displays the total amount of time for operations displayed on the board:



Times in all columns mentioned above, are displayed in hours and minutes format, as shown in the tooltip on the column headers when hovered on:


    • Related Articles

    • Customise your Production, Pre-Production and All Job boards

      Introduction The printIQ All Jobs, Pre-Production & Production Boards can be configured at a user level on a tab-by-tab basis, to display the column options as required. For example, on the Production Board the ‘Printing’ department tab can be ...
    • Production Time Entry

          To manage time tracking on a specific job, enter your job number in the top right to find your job. From this screen you can edit logged times or add additional times, in the example below you will see times elapsed per process and operation and ...
    • Inventory Planning Workflow Board

      Overview The Inventory Planning board is designed to centralize and streamline the planning of inventory items required across Jobs and Sales Orders. It provides visibility into inventory demand, current stock, and purchasing needs, helping planners ...
    • Production Board Order and Icon Customization

      The Schedule Categories and Job Progress icons that show up throughout the system can be customized. Schedule Categories and Job Progress Icons The Schedule Category can be changed, and the icon can be switched out. When changing these, the IQ ...
    • Parent Operations

      Parent operations offer the ability to group related operations together and bring them onto bespoke quotes in one go. IQ has the ability to bring related operations together under one single (Parent) operation. The benefits of this include the fact ...