Production Ganging Demonstration

Production Ganging Demonstration



    • Related Articles

    • Production Boards – Job order drag & drop

      Introduction On both the Pre-Production and the Production boards, the user can move the job order one by one or by multi-selection via the checkboxes. Job Order Drag & Drop One by One By clicking and holding on jobs ‘arrows’ icon You can drag and ...
    • TOT - Total Operation Time and TPT - Total Production Time

      Definition TOT: Total Operation Time, seen in the screenshot below. The system will calculate the total amount of Operation time based on the amount of jobs that show on the board:     Definition TPT: Total Production Time The system will calculate ...
    • printIQ Workflow

      Demonstration of the printIQ workflow.
    • Gang Based Estimating

      Offset and Digital printing is not currently supported in this development. The printIQ Gang module is required to access this functionality. Custom Quoting It is common with wide and large format work to require the quote to be based on a ‘gang ...
    • Gang Based Estimating Template Setup

      Settings In order to have gang-based estimating work properly, a template and descriptions must be set up. Template Setup There are various settings inside the ‘Production Admin’ screen related to ganging. Here you can set the default bleed and grips ...