Processes - Mapping to the press
This is where you map the previously made ‘ink processes’ (originally setup under ‘Processes’ in the ‘Inventory’ section) to each press.
This is managed from Admin > Configure Factory > Processes.
The following box will appear:
Here you can enter all the specific process details.
Once completed, click ‘Add Process to Press’.
The process information will now be added to a list at the bottom of the screen.
For sheetwork you only need to map one side but for ‘Perfecting and Work and Turn’ you need to map both sides.
SHEETWORK Example.
PERFECTING Example.
Note for perfecting, only the first pass has a ‘1’ added. The second side has a ‘0’. This is because there is only a single pass in perfecting.
WORK & TURN Example.
Note for Work & Turn. As both passes are done separately, both front and back have a ‘1’ in the ‘Passes’ column.
For each process, you must map the ‘Inks. Click ‘Ink’ on the right of each process.
The following box will show.
For each ‘ink’ you need to add a percentage of coverage and a calculation method from the drop down boxes.
Each mapped ink will show below.
Every process must have ink quantities mapped to them.
Related Articles
Processes - Create new processes
This is where you enter details on the various ‘colour process’ options you can produce on your presses. All this is managed from ‘processes’ under ‘Inventory’ in the ‘Configure the Factory’ screen. The following box will appear: Here you ...
Mapping stocks to presses (new)
MAPPING STOCKS TO PRESSES (new) Add specific rules for which stocks can be printed on each press. Under Admin> Configure Factory > Equipment > Stocks. Begin by selecting the press you would like the stock rules mapped to: Select Type: Use ...
Mapping stocks to presses (old)
You will need to map the stocks to the presses you wish to print them on. Go into the stock mapping screen. Add the stocks that you wish to map into the stock mapping section, tick on all stocks that you wish to map. Choose what press you ...
Press Cost Component Definitions.
The press cost component record drives the production times and the costs for the press record. There can be many component records that are engaged for different criteria. It is suggested that when building press component records you start out ...
Sheeting on a Web Press with a Fixed Cut-Off
Sheeting on a web press requires setting up another version of the Web Press (like we would Sheet Work, Work&Turn, Work&Tumble on an offset press). This is intended for a web press with a fixed cut-off. The goal is to create version of the press as ...