Inline On Press / Plan On Press Operations

Inline On Press / Plan On Press Operations

You can mark a ‘section’ operation as part of an inline operation on the press.

The following options are found under the ‘Charge Options’ components:
Enable Inline Timing – This is for when you want the operation to be times individually from the print.
Inline with Press – This marks the operation to be capacity planned on the press the job will run on.
Combine Inline Makeready – This adds the makeready time into the press makeready time.

In this example we have the two operations, one for diecut and one for UV as inline on press:


You will see in the quote pricing grid, the inline operations are linked to the press. The makeready time is also a combination of the press makeready and the addition makeready from the operations. The speed is taken from the slowest speed set on the added operations:

**See below the same specs but with no inline finishing. The makeready is only based on the press and the speed from the press speed:

On the job, only the ‘Printing’ needs to be timed:


When capacity planning, there is only the printing operation. The inline operation details show at the bottom of the tag:


PLAN ON PRESS
You can also mark an operation as ‘Plan on Press’ via the checkbox in the ‘Production Options’:


This then adds as a separate operation to the job details:


It splits the main print from the ‘Washup’ and keeps the operations separate for timing and planning:


    • Related Articles

    • PRESSES - Inline Finishing Speed

      Inline operations refer to operations that can be performed ‘in-line’ with the printing. For some inline finishing operations, the press speed needs to be reduced to accommodate the speed of the inline finishing machine. There is a new setting on the ...
    • Setting Up A Press

      1. Creating a Press [v39] To create a press in printIQ go to the Admin Menu and following it down to Configure Factory From here go to the EQUIPMENT section and click on PRESSES [v40] To create a press in Print IQ go to the Admin option and under ...
    • Operation Component Definitions for Side-Finishing

      Differences Between SIDE, SECTION and JOB Operations IQ has an extremely powerful engine that drives each operation. The component records for SIDE, SECTION and JOB operations all have different functionality, and you need to decide what you want to ...
    • Operation Component Definitions for Section-Finishing

      Differences Between SIDE, SECTION and JOB Operations IQ has an extremely powerful engine that drives each operation. The component records for SIDE, SECTION and JOB operations all have different functionality, and you need to decide what you want to ...
    • Operation Component Definitions for Job-Finishing

      Differences Between SIDE, SECTION and JOB Operations IQ has an extremely powerful engine that drives each operation. The component records for SIDE, SECTION and JOB operations all have different functionality, and you need to decide what you want to ...