Capability to add Reference in QA and Task in Job details. (as per below image)
Before:
After – Reference added below.
How to add reference in Task.
1. Navigate to Admin > References
2. Under Reference Field, Click the dropdown and find Task.
3. Click Magnifying glass button and a modal dialog window will show up
• Text: Text box for string and number
• Number: Text box number only
• List: Dropdown box with values as per entered in the values fields shwon in screenshot below
• Date: Date selector
• Look up: Only GL Group to look up
Screenshot below shows sample of GL Look up selector
4. Where the added reference field will be shown on the Job Task at the bottom
This gives an indication of the tasks you have. Clicking this will open the task screen.
The Number on the left (below screenshot shows 3) Indicates how many incomplete tasks you have.
The Number on the right (here 2) indicates how many tasks you have assigned to someone.
Tasks View screen